Model for Process, Activity and Event Details

Parent Previous Next

The Model

We executed a simulation run on the model depicted below. It is quite simple and consists of one start event, two activities and one end event.

Figure 1: Example Model


We urge you to reproduce the simulation report described below to get a better understanding, if you are looking at this topic for the first time. The following table shows the parameter settings of the model. We left all the other parameters unchanged (default).


BPMN Element

Simulation Properties

Start event

Inter-arrival Time: Constant Distribution with Constant Value = 2

Activity "Work"

Duration: Constant Distribution with Constant Value = 12

Activity "Prepare to go home"

Duration: Normal Distribution with Mean = 12 and Standard Deviation = 3

General Simulation Properties

Stochastic Seed

12345

Simulation stop time (hours)

240